Customization: | Available |
---|---|
Type: | Clay Dry Sand |
Casting Method: | Directional Crystallization |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Production Process:Investment casting/ Lost Wax Casting/ Stainless steel casting/ sand casting
Material:Alloy Steel,1020, 1045, 4140, WCB, LCB
Stainless Steel: SS304, SS304L, SS316, SS316L, CF8M, CF-8,
Casting Weight: 0.3-10kg
Casting Tolerance: CT4-CT7
Machining Tolerance: IT4-IT12
PROCESS | MATERIAL | STANDARD | |
SAND CASTING |
Green Sand | Grey Iron, Ductile Iron, Malleable Iron, Stanless Steel, Carbon, Steel, Aluminium | ASTM BS JIS DIN etc |
Furan Resin Sand | |||
Cold Harden Resin Sand | |||
INVESTMENT CASTING |
Sodium Silicone (Water galss) | Stainless Steel, Carbon Steel, Special Alloy Steel Aluminum | |
Silica Sol | |||
FORGING | Hammer Forging | Stainless Steel, Carbon Steel, Alloy Streel, Aluminum | |
Die Forging | |||
Roll Forging | |||
STAMPING MACHINING | STAMPING MACHINING | All metal material |
Q: Are you a trading company or manufacturer?
A: We are a factory with more than 20 years' experience.
Q: How long for delivery?
A: Generally it is 15-30days as we are a customized service we confirm with customers when place order.
Q: What is the MOQ?
A: It depends on what you are buying. Normally, our minimum order is one 20' full container and an LCL container (less than a
container load) can be acceptable.
Q: Can you customize my products?
A: Yes, we can customize products with your design drawings like DWG, DXF, DXW, IGES, STEP, PDF, etc.
Q: What is your terms of payment?
A: 30% T/T in advance, balance before shipment, or as per discussion.
Q: What about your quality control?
A: * . Checking the raw material after they reach our factory-----Incoming quality control(IQC)
* . Checking the details before the production line operated
* . Have a full inspection and routing inspection during mass production----In-process quality control(IPQC)
* . Checking the goods after they are finished----Final quality control(FQC)
* . Checking the goods after they are finished----Outgoing quality control(QC) * . 100% inspection and delivery before shipment