Customization: | Available |
---|---|
Warranty: | 1 Year |
Acting Form: | Double-Acting |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Application Specification:
Initial Startup Checks:
Check the accuracy of design and installation of hydraulic station:
♦ Make the distance between inlet and outlet as long as possible.
♦ The pipe orifice of inlet and outlet should be slope and the section eagle should be greater than or equal to 45°, in order to increase passage section ,slower velocity, recommend velocity in inlet is between 0.5m/s and 1.9m/s. and in outlet is below 6m/s.
♦ Confirm the oil ports are below the oil level in fuel tank in the worst-case scenario (example: all of hydraulic cylinder pistons are extending to the extreme position),
♦ Specifications of the air filter should be threes greater than the maximum return flow.
♦ Set the release valve for exhaust on oil returning pipe; and you can also slightly loosen the joint of pump outlet to vent until there are no bubbles in the oil spill, then you can tighten the joint to produce the same effect.
Notice: This method is suitable for low pressure and you should make sure the pressure will not rise.
Q: Are you trading company or manufacturer?
A: We are factory with more than 20 years experience.
Q: How long for delivery?
A: Generally it is 15-30days as we are customized service we confirm with customer when place order.
Q: What is the MOQ?
A: It depends on what you are buying. Normally, our minimum order is one 20' full container and LCL container (less than a
container load) can be acceptable.
Q: Can you customize my products?
A: Yes, we can customized products with your design drawings like DWG, DXF, DXW, IGES, STEP, PDF etc.
Q: What is your terms of payment?
A: 30% T/T in advance, balance before shipment, or as per discussion.
Q: What about your quality control?
A: * . Checking the raw material after they reach our factory-----Incoming quality control(IQC)
* . Checking the details before the production line operated
* . Have full inspection and routing inspection during mass production----In-process quality control(IPQC)
* . Checking the goods after they are finished----Final quality control(FQC)
* . Checking the goods after they are finished----Outgoing quality control(QC)
* . 100% inspection and delivery before shipment