Customization: | Available |
---|---|
Function: | Balance, Pressure Regulating, Reversing, Flow Control |
Installation: | Tubular |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Cavity T-2A
Series 2
Capacity 30 gpm
Pilot Ratio 4.5:1
Maximum Recommended Load Pressure at Maximum Setting 3850 psi
Maximum Setting 5000 psi
Factory Pressure Settings Established at 2 in³/min.
Maximum Valve Leakage at Reseat 5 drops/min.
Adjustment - No. of CCW Turns from Min. to Max. Setting 3.75
Operating Characteristic Standard
Reseat >85% of setting
Valve Hex Size 1 1/8 in.
Valve Installation Torque 45 - 50 lbf ft
Adjustment Screw Internal Hex Size 5/32 in.
Locknut Hex Size 9/16 in.
Locknut Torque 80 - 90 lbf in.
Model Weight 0.63 lb.
Counterbalance valves with pilot assist are meant to control an overrunning load. The check valve allows free flow from the directional valve (port 2) to the load (port 1) while a direct-acting, pilot-assisted relief valve controls flow from port 1 to port 2. Pilot assist at port 3 lowers the effective setting of the relief valve at a rate determined by the pilot ratio.
Other names for this valve include motion control valve and over-center valve.
Q: Are you trading company or manufacturer?
A: We are factory with more than 20 years experience.
Q: How long for delivery?
A: Generally it is 15-30days as we are customized service we confirm with customer when place order.
Q: What is the MOQ?
A: It depends on what you are buying. Normally, our minimum order is one 20' full container and LCL container (less than a
container load) can be acceptable.
Q: Can you customize my products?
A: Yes, we can customized products with your design drawings like DWG, DXF, DXW, IGES, STEP, PDF etc.
Q: What is your terms of payment?
A: 30% T/T in advance, balance before shipment, or as per discussion.
Q: What about your quality control?
A: * . Checking the raw material after they reach our factory-----Incoming quality control(IQC)
* . Checking the details before the production line operated
* . Have full inspection and routing inspection during mass production----In-process quality control(IPQC)
* . Checking the goods after they are finished----Final quality control(FQC)
* . Checking the goods after they are finished----Outgoing quality control(QC)
* . 100% inspection and delivery before shipment