Customization: | Available |
---|---|
Function: | Balance, Pressure Regulating, Reversing, Flow Control |
Installation: | Tubular |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Cavity T-18A
Series 4
Capacity 200 gpm
Factory Pressure Settings Established at 4 gpm
Maximum Operating Pressure 5000 psi
Maximum Valve Leakage at Reseat 10 drops/min.
Response Time - Typical 2 ms
Reseat >90% of setting
Adjustment - No. of CW Turns from Min. to Max. setting 6
Valve Hex Size 1 5/8 in.
Valve Installation Torque 350 - 375 lbf ft
Adjustment Screw Internal Hex Size 5/32 in.
Locknut Hex Size 9/16 in.
Locknut Torque 80 - 90 lbf in.
Model Weight 3.30 lb.
Direct-acting relief cartridges are normally closed, pressure-limiting valves used to protect hydraulic components from pressure transients. When the pressure at the inlet (port 1) reaches the valve setting, the valve starts to open to tank (port 2), throttling flow to limit the pressure rise. These valves are smooth and quiet, essentially zero leak, dirt tolerant, immune to silting and are very fast.
Q: Are you trading company or manufacturer?
A: We are factory with more than 20 years experience.
Q: How long for delivery?
A: Generally it is 15-30days as we are customized service we confirm with customer when place order.
Q: What is the MOQ?
A: It depends on what you are buying. Normally, our minimum order is one 20' full container and LCL container (less than a
container load) can be acceptable.
Q: Can you customize my products?
A: Yes, we can customized products with your design drawings like DWG, DXF, DXW, IGES, STEP, PDF etc.
Q: What is your terms of payment?
A: 30% T/T in advance, balance before shipment, or as per discussion.
Q: What about your quality control?
A: * . Checking the raw material after they reach our factory-----Incoming quality control(IQC)
* . Checking the details before the production line operated
* . Have full inspection and routing inspection during mass production----In-process quality control(IPQC)
* . Checking the goods after they are finished----Final quality control(FQC)
* . Checking the goods after they are finished----Outgoing quality control(QC)
* . 100% inspection and delivery before shipment