Customization: | Available |
---|---|
Function: | Balance, Pressure Regulating, Reversing, Flow Control |
Installation: | Tubular |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Cavity T-31A
Series 1
Capacity 10 gpm
Maximum Operating Pressure 5000 psi
Pilot Flow 23 in³/min.
Valve Hex Size 7/8 in.
Valve Installation Torque 30 - 35 lbf ft
Model Weight 0.37 lb.
Low-side (hot oil) shuttle cartridges allow hot oil to be diverted from the low pressure side of a closed loop system. When both work ports (ports 2 and 4) are at equal pressures the valve is spring-centered to an all-ports-blocked position. When one of the work ports (port 2 or 4) sees a higher pressure the opposite work port is connected to the common port (port 3).
The spool incorporates a hydraulic stop that eliminates mechanical impact and therefore the potential for internal damage.
The hydraulic stop results in a small pilot flow from the high side work port (port 2 or 4) to the common port (port 3).
A unique feature due to the hydraulic stop is that the hot oil relief setting can be confirmed with the transmission in neutral.
NOTE: Low shift values can potentially result in charge pump pressure alone inadvertently shifting the valve. Use care when selecting shift pressure.
Although this valve goes into a 4-port cavity, the nose (port 1) is not used.
Incorporates the Sun floating style construction to minimize the possibility of internal parts binding due to excessive installation torque and/or cavity/cartridge machining variations.
Q: Are you trading company or manufacturer?
A: We are factory with more than 20 years experience.
Q: How long for delivery?
A: Generally it is 15-30days as we are customized service we confirm with customer when place order.
Q: What is the MOQ?
A: It depends on what you are buying. Normally, our minimum order is one 20' full container and LCL container (less than a
container load) can be acceptable.
Q: Can you customize my products?
A: Yes, we can customized products with your design drawings like DWG, DXF, DXW, IGES, STEP, PDF etc.
Q: What is your terms of payment?
A: 30% T/T in advance, balance before shipment, or as per discussion.
Q: What about your quality control?
A: * . Checking the raw material after they reach our factory-----Incoming quality control(IQC)
* . Checking the details before the production line operated
* . Have full inspection and routing inspection during mass production----In-process quality control(IPQC)
* . Checking the goods after they are finished----Final quality control(FQC)
* . Checking the goods after they are finished----Outgoing quality control(QC)
* . 100% inspection and delivery before shipment